Ormet Aluminum Refinery
Hannibal, Ohio
Client
Longridge Energy
Project Status
Complete
Markets
Industrial

Demolition of two 250-foot smokestacks, a 100-foot-tall pollution control scrubber, and a 150-foot-tall carbon processing structure across 3,000,000 SF, plus scrap processing of 18M lbs of aluminum, 5M lbs of copper, and 60,000 tons of steel, with asbestos and hazardous material removal.
3,000,000
Square Footage
0
Injuries
