Cahokia Terminal Power Plant
Sauget, Illinois
Client
Watco
Project Status
Complete
Markets
Energy, Industrial

01 / 11
The Cahokia Terminal Power Plant was once the largest plant in the Mississippi Valley. When commissioned in 1923, the facility consumed a ton of coal every 30 seconds and drew more than 600 million gallons of water a day, making it a defining piece of regional industrial infrastructure for the better part of a century. Spirtas Worldwide was contracted directly by owner WATCO Companies, LLC to remediate and demolish all above-grade structures on the site, including six 400-foot-tall smokestacks that had fallen into serious disrepair and were actively crumbling. The scale and deteriorating condition of the structures added a significant layer of complexity, which Spirtas Worldwide addressed by working lock-step with a nationally renowned engineering firm throughout planning and execution. Every OSHA engineering survey on the project was first developed through designed prints created by Spirtas Worldwide in conjunction with Thornton Tomasetti, ensuring the correct sequence of dismantle and demolition for a site still in active use — including a live river and rail access point, active coal storage and blending operations, and an operating trans-loading facility immediately adjacent to the work. Spirtas Worldwide's scope spans full 3D modeling and AutoCAD-driven demolition sequencing, Phase II asbestos remediation, and the controlled removal of over 1,000 tons of concrete, brick, and block across 300,000 SF of slab, mezzanine, and equipment structures.
800,000
Square Footage
0
Injuries